Baomahun Gold Mine | 33.4 MWp

Project Name:
Baomahun Gold Mine Project
Type of Project:
Service:
Location:
Sierra Leone
Model:
Size:
33.4 MWp
Status:
Under Construction

The project features a 33.4 MWp ground-mounted solar PV system combined with a 13 MWh battery energy storage system (BESS) and 21 MW HFO gensets, integrated through a Micro Grid Control Solution (MCS). The PV system utilizes Aiko modules, Sungrow inverters and transformers, and a Zimmermann mounting system with an east-west fixed-tilt configuration. The project is currently under construction.

‍

Project Lead Office

Soventix Hybrid Nigeria Ltd

74 Oduduwa Crescent,
100271 Ikeja GRA,

Lagos, Nigeria

Project-Related News

No items found.