Toyota South Africa Manufacturing | 1.95 MWp

Project Name:
Toyota South Africa Manufacturing
Type of Project:
Service:
Location:
Kwa-Zulu Natal, Durban
Model:
Cantilever
Size:
1.95 MWp
Status:
Completed August 2023

The Toyota South Africa Manufacturing solar project in Kwa-Zulu Natal, Durban, is a 1.95 MWp cantilever system that generates 2,841,936 kWh (2.84 GWh) of electricity per year, reducing CO2 emissions by 3,012 tonnes per year.

‍

Project Lead Office

Soventix South Africa (Pty) Ltd

Portion No 2, Farm Number 78
Devon Valley, Stellenbosch Road

7600 Stellenbosch

South Africa

Project-Related News

October 30, 2024

Landmark Achievement in Renewable Energy!

We're thrilled to unveil the breathtaking Kalsow Project, a pioneering 26MWp solar installation that's redefining the future of clean energy!.